Picture of a BP gas station that is a client of Creek Runk, LLC

REMEDIATING PETROLEUM CONTAMINATION

Remediating Petroleum Contamination at an Active Gas Station Project Highlights Over 1.5 million gallons of impacted groundwater extracted and treated IDEM approved No Further Action with a recorded ERC in 2022 Creek Run-submitted ELTF claims received 98% reimbursement of remediation costs Creek Run began work at this

Read More

SITE CLOSURE WITH MPE REMEDIATION SYSTEM

Site Closure Achieved With Help of MPE Remediation System Project Highlights Excavated 898 tons of petroleum-impacted soil Over 1.5 million gallons of impacted groundwater extracted and treated IDEM approved No Further Action with a recorded ERC in 2022 Creek Run-submitted ELTF claims received 100% reimbursement of remediation

Read More
A 20,000-gallon tank being installed into the ground at a gas station job site

UST INSTALLATION – WHAT ABOUT DE-WATER?

UST Installation – What About De-Water? Project Highlights Remediation systems utilized to de-water tank cavity for UST installation Over 10.3 million gallons of petroleum-impacted water extracted and treated during 11 days Water disposed under an NPDES permit Facilitated the installation of a new 24,000-gallon UST In July

Read More
Three men stand in a trench about waist-deep with pipes at their feet.

CREEK RUN INSTALLS REMEDIATION SYSTEM IN NEW ALBANY

Creek Run Install Remediation System in New Albany, Indiana In Fall 2015 and Spring 2016, Creek Run completed the installation of a Soil Vapor Extraction (SVE)/Air Sparge (AS) with Groundwater Pump & Treat (P&T) remediation system at a former gas station in New Albany, Indiana.  The soil

Read More
A man stands waist-deep in a narrow trench, watching an excavator dig more trench.

CREEK RUN INSTALLS NEWBERRY REMEDIATION SYSTEM

Creek Run Installs Newberry Remediation System In Fall 2014, Creek Run completed the installation of a dual-phase extraction (DPE) remediation system equipped with sub-slab ventilation at a former gas station in Newberry, Indiana.  While this was not the most complex system we have installed, this project is

Read More
Multiple employees maneuver one remediation system to be stacked on another one.

SMALL FOOTPRINT ISSUE FIXED BY TOW-TIERED SYSTEM

Small Foot-Print Problem Resolved by Two-Tiered Remediation System In Spring 2014, Creek Run installed a two-tiered remediation system for a client that was concerned about limited parking space and overall profile at one of their convenience stores in Michigan City, Indiana.  Upon site characterization approval in December

Read More